Construction of 10” X 80m Olam Power Plant Natural Gas Pipeline project. (Technical
leadership, Project Management & Interface).
Construction of 8” X 380m Gemini Steel Natural Gas Pipeline Project and Furnace Burner connection. (Technical leadership, Project Management & Interface).
EPC Project To Installation of a 15MMSCF/Day Natural Gas Plant with An Operating Pressure Of 17bar Operating at Average Volume Of 9MMSCFD To Power gas Delta Innovations Ltd (The Project Engineer)
Construction of 8” X 800m Lafarge Power Plant Natural Gas Pipeline project (Technical leadership, Project Management & Interface).
Construction of 8” X 622m Amdini Industries Ltd Ikorodu Natural Gas Pipeline project.
(Technical leadership, Project Management & Interface).
Construction of a 12” X 6.5km OGIJO Natural Gas Pipeline upgrade project. (The Project
Engineer).
EPC project to upgrade Ewekoro Gas Metering Station owned by Nigeria Gas Marketing Company operating at average volume of 25MMSCF/D to deliver 50MMSCF/D volume of gas. (The Project Engineer).
Construction of 6” X 1.7km Golden Tulip Natural Gas Pipeline project. (Technical
leadership, Project Management & Interface).
Construction of 4” X 1.2km Ikeja Electricity Board Natural Gas Pipeline project.(Technical leadership, Project Management & Interface).
Connection of new 3″ to 10″ gas line from the gas Source to the generator at Crown Floor Mill Ikorodu.
Construction of fire hydrant line at Checkers African PLC
Lagging of 8″ gas line from the Scrubber to the generator Building at Lafarge African PLC
Maintenance of boiler station at Crown Floor Mill Ikorodu.
Construction of fire hydrant at Crown Floor Mill Ikorodu.
Installation and Lagging of 14″, 8″, and 5″, of Chiller Water pipeline at Kimberly Clark Production Mill Ikorodu.